Completed
- Start
- Projects
- Completed
-
All
Abu Dhabi, UAE
German General Hospital (Middle East) LLC.
New Private German General Hospital Abu Dhabi
Area 21,400 m² UFA Scope Medical and laboratory equipment planning Cost 30.3 Mio. Euro Completion 2008 - 2012
Bad Soden
Kliniken des Main Taunus Kreises GmbH
Restructuring and extension Bad Soden Hospital, New Main-Taunus Private Clinic
Area 14,900 m² UFA Scope Medical and laboratory equipment planning Cost 7.5 Mio. Euro Completion 2005 - 2010
Basel, Switzerland
ARGE HandinHand
Replacement Felix Platter-Hospital
Area 23,600 m² UFA Scope Medical and laboratory equipment planning, BIM Cost 15.2 Mio. CHF Completion 2014 - 2018
Braunschweig
Städtisches Klinikum Braunschweig gGmbH
Restructuring GMP Center for Clinical Transfusion Medicine and Pharmacy at Braunschweig Municipal Hospita
Area 500 m² UFA Scope Laboratory equipment planning Cost 0.9 Mio. Euro Completion 2006 - 2009
Bremerhaven
Klinikum Bremerhaven-Reinkenheide gGmbH
Replacement and restructuring Clinical Center Bremerhaven-Reinkenheide
Area 4,400 m² UFA Scope Medical equipment planning Cost 13.0 Mio. Euro Completion 2006 - 2012
Cottbus
Carl-Thiem-Klinikum Cottbus gGmbH
Extension for Hybrid-OR
Area 500 m² UFA Scope Medical equipment planning Cost 4.0 Mio. Euro Completion 2020 - 2021
Dresden
Städtisches Klinikum Dresden-Neustadt
Restructuring interdisciplinary ITS/IMC and extension surgical area
Area 2,000 m² UFA Scope Medical and laboratory equipment planning Cost 6.7 Mio. Euro Completion 2014 - 2018
Dresden
University Hospital Carl Gustav Carus Dresden
Replacement Surgical Center
Area 10,200 m² UFA Scope Medical and laboratory equipment planning Cost 11.8 Mio. Euro Completion 1998 - 2002
Dresden
University Hospital Carl Gustav Carus Dresden
Replacement Mildred Scheel Haus
Area 1,500 m² UFA Scope Medical and laboratory equipment planning Cost 3.1 Mio. Euro Completion 2002 - 2003
Dresden
University Hospital Carl Gustav Carus Dresden
Replacement Clinic for Obstetrics and Gynaecology
Area 14,200 m² UFA Scope Medical and laboratory equipment planning Cost 8.5 Mio. Euro Completion 1998 - 2003
Erfurt
HELIOS Kliniken GmbH
Restructuring and replacement Clinics for Psychiatry, Psychotherapy and Psychosomatic, for Children and Adolescent Psychiatry and Psychosomatic and for Geriatrics and Geriatric Day Clinic
Area 7,900 m² UFA Scope Medical equipment planning Cost 2.8 Mio. Euro Completion 2003 - 2008
Essen
University Hospital Essen
Replacement Medical Center University Hospital Essen
Area 9,000 m² UFA Scope Medical equipment planning Cost 13.0 Mio. Euro Completion 2004 - 2011
Essen
STRABAG Real Estate GmbH / IBA Technology Group
New West German Proton Therapy Center Essen (WPE), University Hospital Essen
Area 4,900 m² UFA Scope Medical equipment planning Cost 1.3 Mio. Euro Completion 2009 - 2010
Frankfurt
University Hospital Frankfurt
New Johanna-Quandt-Center for Pediatric Stem Cell Transplantation and Celluar Therapy
Area 1,700 m² UFA Scope Medical and laboratory equipment planning Cost 3.3 Mio. Euro Completion 2011 - 2017
Frankfurt
Clinical Center Frankfurt Höchst
Replacement Interdisciplinary Emergency Center and Acute Care Facility
Area 4,600 m² UFA Scope Medical equipment planning Cost 7.0 Mio. Euro Completion 2001 - 2006
Frankfurt
Sankt Katharinen Krankenhaus GmbH
Restructuring and extension Sankt Katharinen Hospital Frankfurt
Area 3,500 m² UFA Scope Medical equipment planning Cost 3.3 Mio. Euro Completion 2000 - 2005
Frankfurt
Agaplesion Frankfurter Diakonie Kliniken gGmbH
Agaplesion Bethanien Hospital Frankfurt Replacement acute medical care unit
Area 3,450 m² UFA Scope Medical equipment planning Cost 4.7 Mio. Euro Completion 2002 - 2005
Frankfurt
Fraport AG Airport Clinic
Restructuring Building 201
Area 2,400 m² UFA Scope Medical equipment planning Cost 1.8 Mio. Euro Completion 2011 - 2022
Grossburgwedel
Kliniken Region Hannover GmbH
Replacement and restructuring Clinical Center Grossburgwedel
Area 6,600 m² UFA Scope Medical equipment and radiation protection planning Cost 8.6 Mio. Euro Completion 2011 - 2016
Halle
German Cancer Aid / University Hospital Halle
New National Center for Cell and Gene Therapy Halle
Area 3,000 m² UFA Scope Medical and laboratory equipment planning Cost 9.2 Mio. Euro Completion 2002 - 2005
Hamburg
University Medical Center Hamburg-Eppendorf
Replacement and reconstruction Pediatric Clinic at University Medical Center Hamburg-Eppendorf
Area 11,600 m² UFA Scope Medical equipment and radiation protection planning Cost 14.5 Mio. Euro Completion 2012 - 2017
Hannover
Fraunhofer-Gesellschaft e.V. München
New Clinical Research Center Hannover
Area 7,000 m² UFA Scope Medical and laboratory equipment planning Cost 7.3 Mio. Euro Completion 2010 - 2015
Heidelberg
German Cancer Aid / Dr. Mildred Scheel Foundation for Cancer Research
New National Center for Tumor Deseases University Hospital Heidelberg (NCT)
Area 5,600 m² UFA Scope Medical and laboratory equipment planning Cost 5.0 Mio. Euro Completion 2006 - 2010
Hofheim
Kliniken des Main-Taunus-Kreises GmbH
Replacement Hofheim Hospital
Area 10,500 m² UFA Scope Medical and laboratory equipment planning Cost 11.2 Mio. Euro Completion 2010 - 2016
Kaiserslautern
Westpfalz-Klinikum GmbH
Replacement imaging equipment at Kaiserslautern and Kusel hospitals
Area - Scope Medical equipment planning Cost 5.7 Mio. Euro Completion 2011 - 2013
Koblenz
German Federal Armed Forces
Replacement and extension Building F1 Central Military Hospital Koblenz
Area 3,500 m² UFA Scope Medical and laboratory equipment planning Cost 5.7 Mio. Euro Completion 2003 - 2008
Koblenz
Landesbetrieb Liegenschafts- u. Baubetreuung Koblenz Bundeswehrzentralkrankenhaus Koblenz
New Inpatient Ward Federal Armed Forces Hospital Koblenz
Area 4,400 m² UFA Scope Medical equipment planning Cost 2.5 Mio. Euro Completion 2009 - 2018
Köln
Medtronics gGmbH
Replacement and reconstruction Center for Cardiology Merheim Clinic
Area 4,400 m² UFA Scope Scope Medical equipment and radiation protection planning Cost 6.0 Mio. Euro Completion 2016 - 2021
Köln
Kliniken der Stadt Köln gGmbH
Replacement imaging equipment and reconstruction at Merheim, Holweide and Riel clinics
Area 1,900 m² UFA Scope Medical equipment planning Cost 8.5 Mio. Euro Completion 2006 - 2012
Leipzig
University Hospital Leipzig
Replacement Center for Gynocology, Pediatrics - New Center for Conservative Medicine
Area 42,000 m² UFA Scope Medical and laboratory equipment planning Cost 30.3 Mio. Euro Completion 2005 - 2009
Leipzig
University Hospital Leipzig
Replacement and reconstruction Center for Transfusion Medicine
Area 4,400 m² UFA Scope Medical and laboratory equipment planning Cost 7.5 Mio. Euro Completion 2010 - 2013
Leipzig
University Hospital Leipzig
Extension and restructuring University Hospital Leipzig
Area 13,300 m² UFA Scope Scope Medical equipment planning and feasibility study Cost 12.8 Mio. Euro Completion 2014 - 2020
Linz, Austria
Krankenhaus der Elisabethinen in Linz GmbH
Replacement and restructuring Elisabethinen Hospital Linz, Austria
Area 14,700 m² UFA Scope Medical and laboratory equipment planning Cost 8.7 Mio. Euro Completion 2005 - 2010
Ludwigshafen
Klinikum der Stadt Ludwigshafen am Rhein gGmbH
New Heart Center Ludwigshafen
Area 4,700 m² UFA Scope Medical equipment planning Cost 7.4 Mio. Euro Completion 2011 - 2016
Ludwigshafen
Klinikum der Stadt Ludwigshafen am Rhein gGmbH
Replacement imaging equipment
Area - Scope Medical equipment planning Cost 5.2 Mio. Euro Completion 2008 - 2010
Offenbach
Klinikum Offenbach GmbH
Replacement Medical Center Offenbach
Area 31,200 m² UFA Scope Medical and laboratory equipment planning Cost 47.0 Mio. Euro Completion 2005 - 2010
Prag, Czech Republic
STRABAG Real Estate GmbH
New PTC - Proton Therapy Center Czech s.r.o.
Area 4,200 m² UFA Scope Medical and laboratory equipment planning Cost 13.8 Mio. Euro Completion 2005 - 2006
Rostock
Betrieb für Bau und Liegenschaften Mecklenburg-Vorpommern
Extension Clinic for Radiation Therapy at University Medical Center Rostock
Area 200 m² UFA Scope Medical equipment planning Cost 3.3 Mio. Euro Completion 2014 - 2015
Schotten
Gesundheitszentrum Wetterau gGmbH
Replacement and reconstruction District Hospital Schotten
Area 6,500 m² UFA Scope Medical and laboratory equipment planning Cost 3.7 Mio. Euro Completion 2007 - 2011
Schwarzach, Austria
Kardinal Schwarzenberg‘sches Krankenhaus Betriebsges.mbH
New and reconstruction Children‘s and Young Adults Medicine Clinic Schwarzach, Austria
Area 5,900 m² UFA Scope Medical equipment planning Cost 8.0 Mio. Euro Completion 2010 - 2015
Stuttgart
Robert-Bosch-Foundation Stuttgart
Replacement Charlotten Eye Clinic Stuttgart
Area 2,700 m² UFA Scope Medical equipment planning Cost 3.5 Mio. Euro Completion 2005 - 2008
Tübingen
University Hospital Tübingen
New Health Center Tübingen
Area 6,600 m² UFA Scope Medical equipment planning Cost 1.7 Mio. Euro Completion 2009 - 2012
Tübingen
BG Kliniken Ludwigshafen und Tübingen gGmbH
Replacement imaging equipment at Ludwigshafen and Tübingen hospitals
Area - Scope Medical equipment planning Cost 3.6 Mio. Euro Completion 2017 - 2019 -
2016 - Today
Basel, Switzerland
ARGE HandinHand
Replacement Felix Platter-Hospital
Area 23,600 m² UFA Scope Medical and laboratory equipment planning, BIM Cost 15.2 Mio. CHF Completion 2014 - 2018
Cottbus
Carl-Thiem-Klinikum Cottbus gGmbH
Extension for Hybrid-OR
Area 500 m² UFA Scope Medical equipment planning Cost 4.0 Mio. Euro Completion 2020 - 2021
Dresden
Städtisches Klinikum Dresden-Neustadt
Restructuring interdisciplinary ITS/IMC and extension surgical area
Area 2,000 m² UFA Scope Medical and laboratory equipment planning Cost 6.7 Mio. Euro Completion 2014 - 2018
Frankfurt
University Hospital Frankfurt
New Johanna-Quandt-Center for Pediatric Stem Cell Transplantation and Celluar Therapy
Area 1,700 m² UFA Scope Medical and laboratory equipment planning Cost 3.3 Mio. Euro Completion 2011 - 2017
Frankfurt
Fraport AG Airport Clinic
Restructuring Building 201
Area 2,400 m² UFA Scope Medical equipment planning Cost 1.8 Mio. Euro Completion 2011 - 2022
Grossburgwedel
Kliniken Region Hannover GmbH
Replacement and restructuring Clinical Center Grossburgwedel
Area 6,600 m² UFA Scope Medical equipment and radiation protection planning Cost 8.6 Mio. Euro Completion 2011 - 2016
Hamburg
University Medical Center Hamburg-Eppendorf
Replacement and reconstruction Pediatric Clinic at University Medical Center Hamburg-Eppendorf
Area 11,600 m² UFA Scope Medical equipment and radiation protection planning Cost 14.5 Mio. Euro Completion 2012 - 2017
Hofheim
Kliniken des Main-Taunus-Kreises GmbH
Replacement Hofheim Hospital
Area 10,500 m² UFA Scope Medical and laboratory equipment planning Cost 11.2 Mio. Euro Completion 2010 - 2016
Koblenz
Landesbetrieb Liegenschafts- u. Baubetreuung Koblenz Bundeswehrzentralkrankenhaus Koblenz
New Inpatient Ward Federal Armed Forces Hospital Koblenz
Area 4,400 m² UFA Scope Medical equipment planning Cost 2.5 Mio. Euro Completion 2009 - 2018
Köln
Medtronics gGmbH
Replacement and reconstruction Center for Cardiology Merheim Clinic
Area 4,400 m² UFA Scope Scope Medical equipment and radiation protection planning Cost 6.0 Mio. Euro Completion 2016 - 2021
Leipzig
University Hospital Leipzig
Extension and restructuring University Hospital Leipzig
Area 13,300 m² UFA Scope Scope Medical equipment planning and feasibility study Cost 12.8 Mio. Euro Completion 2014 - 2020
Ludwigshafen
Klinikum der Stadt Ludwigshafen am Rhein gGmbH
New Heart Center Ludwigshafen
Area 4,700 m² UFA Scope Medical equipment planning Cost 7.4 Mio. Euro Completion 2011 - 2016
Tübingen
BG Kliniken Ludwigshafen und Tübingen gGmbH
Replacement imaging equipment at Ludwigshafen and Tübingen hospitals
Area - Scope Medical equipment planning Cost 3.6 Mio. Euro Completion 2017 - 2019 -
2011 - 2015
Abu Dhabi, UAE
German General Hospital (Middle East) LLC.
New Private German General Hospital Abu Dhabi
Area 21,400 m² UFA Scope Medical and laboratory equipment planning Cost 30.3 Mio. Euro Completion 2008 - 2012
Bremerhaven
Klinikum Bremerhaven-Reinkenheide gGmbH
Replacement and restructuring Clinical Center Bremerhaven-Reinkenheide
Area 4,400 m² UFA Scope Medical equipment planning Cost 13.0 Mio. Euro Completion 2006 - 2012
Essen
University Hospital Essen
Replacement Medical Center University Hospital Essen
Area 9,000 m² UFA Scope Medical equipment planning Cost 13.0 Mio. Euro Completion 2004 - 2011
Hannover
Fraunhofer-Gesellschaft e.V. München
New Clinical Research Center Hannover
Area 7,000 m² UFA Scope Medical and laboratory equipment planning Cost 7.3 Mio. Euro Completion 2010 - 2015
Kaiserslautern
Westpfalz-Klinikum GmbH
Replacement imaging equipment at Kaiserslautern and Kusel hospitals
Area - Scope Medical equipment planning Cost 5.7 Mio. Euro Completion 2011 - 2013
Köln
Kliniken der Stadt Köln gGmbH
Replacement imaging equipment and reconstruction at Merheim, Holweide and Riel clinics
Area 1,900 m² UFA Scope Medical equipment planning Cost 8.5 Mio. Euro Completion 2006 - 2012
Leipzig
University Hospital Leipzig
Replacement and reconstruction Center for Transfusion Medicine
Area 4,400 m² UFA Scope Medical and laboratory equipment planning Cost 7.5 Mio. Euro Completion 2010 - 2013
Rostock
Betrieb für Bau und Liegenschaften Mecklenburg-Vorpommern
Extension Clinic for Radiation Therapy at University Medical Center Rostock
Area 200 m² UFA Scope Medical equipment planning Cost 3.3 Mio. Euro Completion 2014 - 2015
Schotten
Gesundheitszentrum Wetterau gGmbH
Replacement and reconstruction District Hospital Schotten
Area 6,500 m² UFA Scope Medical and laboratory equipment planning Cost 3.7 Mio. Euro Completion 2007 - 2011
Schwarzach, Austria
Kardinal Schwarzenberg‘sches Krankenhaus Betriebsges.mbH
New and reconstruction Children‘s and Young Adults Medicine Clinic Schwarzach, Austria
Area 5,900 m² UFA Scope Medical equipment planning Cost 8.0 Mio. Euro Completion 2010 - 2015
Tübingen
University Hospital Tübingen
New Health Center Tübingen
Area 6,600 m² UFA Scope Medical equipment planning Cost 1.7 Mio. Euro Completion 2009 - 2012 -
2006 - 2010
Bad Soden
Kliniken des Main Taunus Kreises GmbH
Restructuring and extension Bad Soden Hospital, New Main-Taunus Private Clinic
Area 14,900 m² UFA Scope Medical and laboratory equipment planning Cost 7.5 Mio. Euro Completion 2005 - 2010
Braunschweig
Städtisches Klinikum Braunschweig gGmbH
Restructuring GMP Center for Clinical Transfusion Medicine and Pharmacy at Braunschweig Municipal Hospita
Area 500 m² UFA Scope Laboratory equipment planning Cost 0.9 Mio. Euro Completion 2006 - 2009
Erfurt
HELIOS Kliniken GmbH
Restructuring and replacement Clinics for Psychiatry, Psychotherapy and Psychosomatic, for Children and Adolescent Psychiatry and Psychosomatic and for Geriatrics and Geriatric Day Clinic
Area 7,900 m² UFA Scope Medical equipment planning Cost 2.8 Mio. Euro Completion 2003 - 2008
Essen
STRABAG Real Estate GmbH / IBA Technology Group
New West German Proton Therapy Center Essen (WPE), University Hospital Essen
Area 4,900 m² UFA Scope Medical equipment planning Cost 1.3 Mio. Euro Completion 2009 - 2010
Frankfurt
Clinical Center Frankfurt Höchst
Replacement Interdisciplinary Emergency Center and Acute Care Facility
Area 4,600 m² UFA Scope Medical equipment planning Cost 7.0 Mio. Euro Completion 2001 - 2006
Heidelberg
German Cancer Aid / Dr. Mildred Scheel Foundation for Cancer Research
New National Center for Tumor Deseases University Hospital Heidelberg (NCT)
Area 5,600 m² UFA Scope Medical and laboratory equipment planning Cost 5.0 Mio. Euro Completion 2006 - 2010
Koblenz
German Federal Armed Forces
Replacement and extension Building F1 Central Military Hospital Koblenz
Area 3,500 m² UFA Scope Medical and laboratory equipment planning Cost 5.7 Mio. Euro Completion 2003 - 2008
Leipzig
University Hospital Leipzig
Replacement Center for Gynocology, Pediatrics - New Center for Conservative Medicine
Area 42,000 m² UFA Scope Medical and laboratory equipment planning Cost 30.3 Mio. Euro Completion 2005 - 2009
Linz, Austria
Krankenhaus der Elisabethinen in Linz GmbH
Replacement and restructuring Elisabethinen Hospital Linz, Austria
Area 14,700 m² UFA Scope Medical and laboratory equipment planning Cost 8.7 Mio. Euro Completion 2005 - 2010
Ludwigshafen
Klinikum der Stadt Ludwigshafen am Rhein gGmbH
Replacement imaging equipment
Area - Scope Medical equipment planning Cost 5.2 Mio. Euro Completion 2008 - 2010
Offenbach
Klinikum Offenbach GmbH
Replacement Medical Center Offenbach
Area 31,200 m² UFA Scope Medical and laboratory equipment planning Cost 47.0 Mio. Euro Completion 2005 - 2010
Prag, Czech Republic
STRABAG Real Estate GmbH
New PTC - Proton Therapy Center Czech s.r.o.
Area 4,200 m² UFA Scope Medical and laboratory equipment planning Cost 13.8 Mio. Euro Completion 2005 - 2006
Stuttgart
Robert-Bosch-Foundation Stuttgart
Replacement Charlotten Eye Clinic Stuttgart
Area 2,700 m² UFA Scope Medical equipment planning Cost 3.5 Mio. Euro Completion 2005 - 2008 -
2000 - 2005
Dresden
University Hospital Carl Gustav Carus Dresden
Replacement Surgical Center
Area 10,200 m² UFA Scope Medical and laboratory equipment planning Cost 11.8 Mio. Euro Completion 1998 - 2002
Dresden
University Hospital Carl Gustav Carus Dresden
Replacement Mildred Scheel Haus
Area 1,500 m² UFA Scope Medical and laboratory equipment planning Cost 3.1 Mio. Euro Completion 2002 - 2003
Dresden
University Hospital Carl Gustav Carus Dresden
Replacement Clinic for Obstetrics and Gynaecology
Area 14,200 m² UFA Scope Medical and laboratory equipment planning Cost 8.5 Mio. Euro Completion 1998 - 2003
Frankfurt
Sankt Katharinen Krankenhaus GmbH
Restructuring and extension Sankt Katharinen Hospital Frankfurt
Area 3,500 m² UFA Scope Medical equipment planning Cost 3.3 Mio. Euro Completion 2000 - 2005
Frankfurt
Agaplesion Frankfurter Diakonie Kliniken gGmbH
Agaplesion Bethanien Hospital Frankfurt Replacement acute medical care unit
Area 3,450 m² UFA Scope Medical equipment planning Cost 4.7 Mio. Euro Completion 2002 - 2005
Halle
German Cancer Aid / University Hospital Halle
New National Center for Cell and Gene Therapy Halle
Area 3,000 m² UFA Scope Medical and laboratory equipment planning Cost 9.2 Mio. Euro Completion 2002 - 2005